Project |
Widened section of driveway and overlaid existing drive surface |
Material |
Stone mastic asphalt finished surface (full construction to widening) |
Border |
Flat topped pin kerbs as edgings |
Foundation |
Full construction to excavation, overlaid existing drive surface |
Timescale |
4 days |